12

How are decisions made for routes through cities

and across city boundaries?

Valley Metro is an inter-city agency set up in 1993 as

the regional public

transportation agency providing coordinated, multi-modal transit options

to residents of greater Phoenix.

Valley Metro provides management for planning, building and

construction and subsequent operation of Light Rail as a collaboration of

cities in the Valley of the Sun through which light rail operates and serves.

The Valley Metro Light Rail system is an ongoing development that is

broken into phases with phases subsequently broken into geographic and

project segments.

Valley Metro gets input frommember cities, engineers, economic

planners, transit planning specialists, and most importantly the public.

Public input opportunities are numerous through the planned Light Rail

service area with community meetings held in all the phases of planning

and construction for light rail segments. For this segment of Light Rail,

116 public outreach activities have been held in the Valley including

community centers, schools, Village Planning Committees, and City

Council meetings.

Public meetings (10), events (22), presentations (41 )and surveys (7)

have taken place for this route locating process to extend Light Rail to

downtown City of Glendale that include proposed alignments in the City

of Phoenix and the Canyon Corridor.

The proposed route selections started with many alternatives (see below)

and was narrowed down through the public outreach along with research

on potential ridership, capital cost, population density, transit dependency/

usage, bike and pedestrian connectivity, potential right-of-way impacts

and a high emphasis on public input. The public and planner input has

narrowed the proposed alternatives to a leading alternative Light Rail

Route* extending fromCamelback Rd. at 19th Ave., west to 43rd Ave,

north to Glendale Ave. and west to 51st Ave, north to Glenn Dr. and west

on Glenn Dr.

— continued next page

Level 1 Route Alternatives

Level 2 Route Alternatives

Level 3 Route

Alternatives

Recommended Light Rail Route

30

Recommended Light Rail Route

30

* Leading Alternative Light Rail Route

Level 3 Evaluation Summary

20

Level 3 Evaluation Summary

Estimated Ridership

Estimated Ridership

Route

Project length

Glendale Ave

5.0 miles

Camelback/

43

rd

Ave

7.0 miles

Camelback/Grand/

51

st

Ave

6.4 miles

Weekday riders (light rail)

5,240

8,250

7,910

Weekday riders per project mile

(light rail)

1,050

1,180

1,240

Weekday riders (bus rapid

transit)

2,980

4,690

4,510

Weekday riders per project mile

(bus rapid transit)

600

670

700

21

Communi t y Highl ights

NorthernAve.

GlendaleAve.

BethanyHomeRd.

CamelbackRd.

51st Ave.

43rd Ave.

35 Ave.

27th Ave.

I-17 Freeeway

51stAve.

43rdAve.

35Ave.

27thAve.

I-17Freeeway

51stAve.

43rdAve.

35Ave.

27thAve.

I-17Freeeway

51stAve.

43rdAve.

35Av.

27thAve.

I-17Freeeway

5A .

h

GlendaleAve.

BethanyHomeRd.

CamelbackRd.

GlendaleAve.

CamelbackRd.

Camelback Rd.

Glendale Ave.

GrandAve.

GrandAve.

GrandAve.

GrandAve.

Northwest Extension

Now Open (2016)

CityofPhoenix

CityofGlendale

CityofGlendale

CityofPhoenix