GCU Today Magazine May 2015 - page 17

GCU TODAY • 17
THE GROVE
• Four six-story residence halls
plus swimming pool, fitness center,
convenience store, office space, two
lighted artificial turf intramural
fields and two lighted half-court
basketball courts
• Acacia, Ironwood and Willow Halls:
866 freshmen each; Juniper Hall: 812
freshmen plus offices on first floor
• Two bedrooms, two bathrooms and a
living room in each suite
• Three residential directors per
hall compared to two in other halls
on campus
GROVE GARAGE
• 2,450 spaces, students only
• By comparison, the garage next door
on 35th Avenue has 1,380 spaces and
the Camelback garage has 1,636.
ENGINEERING BUILDING
• Four-story structure with four lecture
halls, 14 classrooms, eight science labs,
three cadaver labs, a recording studio
and a 3-D printer space
THUNDER ALLEY
• Ground floor will be converted to a
student entertainment center.
LOPESWAY
• Student Union: Einstein Bros Bagels,
The Habit Burger, Slices Pizza,
Mongolian 360 Grill and salad/soup
bar. Qdoba and Mojo Bowl will remain
in current locations.
• Camelback and Prescott halls:
Chick-fil-A, Subway, Panda Express,
Peet’s Coffee & Tea, convenience
store, GCU team store
• Indoor and outdoor eating areas, open
until 1 a.m., in urban community setting
OFFICE BUILDING
•Four-story structure, scheduled
to open in 2016 in a central location,
tentatively will house Administration,
Spiritual Life, Student Engagement,
Residence Life, Career Services
and Athletics.
SOCCER STADIUM
• Berm seating 2,500 to open by first
game in September
• Stadium seating 3,000 to open by
end of year
AGrand Expansion
Grove Garage
Soccer Stadium
Grand Canyon University - Soccer Stadium
suoLL
architects
Engineering Building
Soccer Stadium
Meet the men behind the mortar in a campus
construction video a
renderings courtesy of
suoll architects
1...,7,8,9,10,11,12,13,14,15,16 18,19,20,21,22,23,24,25,26,27,...32
Powered by FlippingBook